Skip to main content

News

|

Drill Pipe Successfully Retrieved from B1-LP3D Well in Al-Khair Field

The Sirte Oil Company for Production and Manufacturing of Oil and Gas has successfully completed a collection operation for drilling pipes at the exploration well (B1-LP3D) in the Al-Khair field.

The final phases of completing the well are currently underway using rig number 22, which belongs to the Arab Drilling and Workover Company (ADWOC Rig #22). This work is being done in preparation for bringing the well into production.

The collection operations were conducted under the supervision of the Drilling and Well Maintenance Department, in collaboration with a local service company that specializes in this area.

Following this achievement, Engineer Masoud Suleman, the Chairman of the Board of Directors of the National Oil Corporation, expressed his gratitude and appreciation to the Chairman of the company’s Board and the technical staff. Their expertise in executing this precise work resulted in significant time and cost savings.